Loading Atlas...

-Z Highway

Open -Z Highway on the Atlas →

Live JSON

Dimension
Nether
Category
Axis
Width
6 blocks
Surface
Obsidian

The HWU-linked May 2025 highway map records this route as 6 blocks wide and 4 blocks high. These are the map's dated construction dimensions. MEG's April 2023 project report also records these dimensions for the full route. MEG reported completing the 6-wide, 4-high tunnel to the Nether world border on May 28, 2022. Credited diggers: Hare_Hare_Yukai, harritaco, Yikyu and Enderlover#4058. The completion dates were published in MEG's January 1, 2023 announcement; they describe the tunnel excavation, not the later paving work.

Clearance: 4 blocks

Builders and maintainers

Sources and attachments

Geometry

Native-dimension Minecraft X/Z block coordinates. Recorded geometry and status do not guarantee current passability.

[{"x":0,"z":0},{"x":0,"z":-30000000}]
Reload 🗙