Konata Izumi Road
Canonical Atlas record. Open interactive page | Live JSON
- Dimension
- Nether
- Category
- Custom
- Width
- 1 blocks
- Surface
- Netherrack Cleared
A straight Nether tunnel at Z=28,500 and Y=5, running from X=0 to the positive-X world border at X=30,000,000. Built by Hare_Hare_Yukai using the accounts Hare_Hare_Yukai and _Zui_, and completed on May 12, 2021. The builder reported 77 digging days. The recorded 1-wide, 2-high profile is inferred from the builder's two-block tunnel cross-section calculation; it is the original digging profile, not a current end-to-end clearance survey.
Length: 30,000,000 blocks
Clearance: 2 blocks
Y level: 5 blocks
Sources and attachments
- Konata Izumi Road - the builder's account
Construction history, coordinates, screenshots and original world download.
Hare_Hare_Yukai - Finishing the road to the Nether world border
The builder reaches the positive-X Nether world border.
Hare_Hare_Yukai - Preparing for the journey - gallery 1
Supplies and travel, December 2020 to February 2021.
Hare_Hare_Yukai (_Zui_) - Preparing for the journey - gallery 2
More screenshots from preparation and the outward journey.
Hare_Hare_Yukai (_Zui_) - Reaching the existing tunnel endpoint - gallery 1
Journey toward X=8.126M before construction, February 2021.
Hare_Hare_Yukai (_Zui_) - Reaching the existing tunnel endpoint - gallery 2
More screenshots from the journey to the starting point.
Hare_Hare_Yukai (_Zui_) - Digging to the border - gallery 1
Construction by _Zui_ from X=8.125M to 30M, February-May 2021.
Hare_Hare_Yukai (_Zui_) - Digging to the border - gallery 2
Further progress on the outer section of Konata Izumi Road.
Hare_Hare_Yukai (_Zui_) - Digging to the border - gallery 3
More of the builder's outer-section construction record.
Hare_Hare_Yukai (_Zui_) - Digging to the border - gallery 4
Final gallery from the outer-section construction record.
Hare_Hare_Yukai (_Zui_) - Connecting the road to spawn - gallery 1
Construction by Hare_Hare_Yukai from X=0 to 8.125M, March-May 2021.
Hare_Hare_Yukai (_Zui_) - Connecting the road to spawn - gallery 2
More screenshots from construction of the inner section.
Hare_Hare_Yukai (_Zui_) - Exploring the Nether world border
The builder's exploration gallery, described as Nether "point nemo".
Hare_Hare_Yukai (_Zui_) - Expedition inventory
The builder's inventory and supplies for the journey.
Hare_Hare_Yukai (_Zui_) - Hare_Hare_Yukai - expedition statistics
In-game statistics shared with the construction account.
Hare_Hare_Yukai (_Zui_) - _Zui_ - expedition statistics
In-game statistics for the account used on the outer section.
Hare_Hare_Yukai (_Zui_) - Additional expedition screenshots
Extra material shared by the builder with the road announcement.
Hare_Hare_Yukai (_Zui_) - Nether world border - raw footage 1
Unedited border exploration linked by the road builder.
Hare_Hare_Yukai - Nether world border - raw footage 2
Unedited border exploration linked by the road builder.
Hare_Hare_Yukai - How the builder planned the journey
Original strategy: supplies, pickaxe repairs and digging to the Nether world border.
Hare_Hare_Yukai - Original Nether world-border WDL
The builder's download of the border area, linked in the 2021 announcement. External download; not an Atlas-validated capture.
Hare_Hare_Yukai - Reference
Geometry
Native-dimension Minecraft X/Z block coordinates. Recorded geometry and status do not guarantee current passability.
[{"x":0,"z":28500},{"x":30000000,"z":28500}]